First season – 1961:
Locker Room Expansion:
The locker room was originally built for the I-Pool. It was enlarged when the T-Pool was built.
This is the locker room facing the I-Pool:
This is the other side of the locker room showing site prep prior to excavation for the T-Pool in 1961:
The T-Pool water was kept clear by a diatomaceous earth filter housed underground, below the T-Pool Locker Room. The filter had to be backwashed, generally twice daily, and a new application of diatomaceous earth applied each time.