Locker Room

The locker room was built to serve the I-Pool and I-Learners.

Original requirements document:

Locker Room Specs

The design of the locker rooms underwent many revisions.

Locker Room Letter 1959

1959 Concept:

Locker Room Concept 2
approach to locker

Final Design:

Locker Room Concept 9
Locker Room Addition as Built

When it was decided that a new pool was required, the locker room was expanded to include more changing space and an office at the front entrance:

The original locker room had a single roof:

As part of the addition, a second roof layer was added which covered both the new and old sections:

Entrance to girls side of locker room:

Interior of Locker Room (mockup):

Behind the far wall was the towel room. This is the towel room exterior:

Sewage from the building drained into a leaching pit in front of the building: