Two outdoor dining shelters were built prior to the third season in the valley.
During roof installation – 1958:

Nearing completion:

With use, it was determined that the ends should be closed. These changes were made in 1960. The upper windows were clear plastic. The bottom level was screened to allow airflow as shown in this plan:
A1 in 1962:
1965:

1965:

A2 ca. 1986:

A1 ca. 1986:
A2 in 2020. The light panels on the sides have been replaced with wood:
Small skylights were added to the top:
See also:




